John and Ellen's RV-7 Build Log and Things
Here's my RV-7 build log! I'm just getting started but I hope to fill these pages up with tips, tricks and helpful links.
Latest Updates: March 24, 2006
The New House
-
In January of 2005, we decided that we wanted to build an airplane. We were renting at the time, and there was no way we'd ever get it going in the place we were at, so we decided to buy a house. Here are some pics of how we transformed the garage into an airplane factory.
- March 20, 2005 :: First day in the new house
- March 21, 2005 :: Second day...more garage work. Looking good
Horizontal Stabilizer
-
Vertical Stabilizer
-
- April 30, 2005 :: Started on the vertical stabilizer
- May 1, 2005 :: Lightening holes and prime structure
- May 2, 2005 :: Mashed some rivets
- May 6, 2005 :: Finished the structure. Got the skins on.
- May 7, 2005 :: Finished the VS!
- Note: At this point, we took a break from building. We were considering a move back to the bay area. Also, things heated up at work and I ran out of time. All of that is straightened out now, though, and I'm back to it!!!!
- September 25, 2005 :: www.ballofshame.com comes online :) I finally figured out an easy way to do a web site...so here it is. Now back to building!
Rudder
-
- September 30, 2005 :: Started on the rudder stiffeners
- October 1, 2005 :: Finished stiffeners and matched drilled the skins
- October 2, 2005 :: Clean workshop and dimple stiffeners
- October 5, 2005 :: Rivet stiffeners to the left skin
- October 8, 2005 :: Build rudder frame and assemble
- October 9, 2005 :: Disassemble, debur and prime
- October 10, 2005 :: Looked at the fiberglass tips for the first time
- October 11, 2005 :: Rivet the rudder frame
- October 12, 2005 :: Start riveting the skins
Tail II. Don't ask...I don't want to talk about it....just accept
Horizontal Stabilizer
-
- October 27, 2005 :: Fedex drops off Tail 2
- November 5, 2005 :: Get the spar and spar caps ready
- November 6, 2005 :: Assemble and match drill the left half. Also, realized one of my screwups and moved on to the VS
- November 22, 2005 :: Back to work on the HS
- November 23, 2005 :: Finished match drilling the right half
- November 24, 2005 :: Deburred the structure. Cooked dinner. Happy Thanksgiving!
- November 25, 2005 :: Dimpled structure. Found that I forgot to match drill some holes. No biggie...just took a second to fix it
- November 27, 2005 :: Got everything primed. This took forever for some reason. I'm just slow today :)
- November 28, 2005 :: Deburred HS skins. Mysterious cleco scratches/gouges on ONE skin....hmmm. Bad day, perhaps? Dunno..
- December 9, 2005 :: Started riveting the HS rear spar.
- December 10, 2005 :: Finished the rear and front spars
- December 11, 2005 :: Screwed up the front spar.... :::sigh:::
- December 30, 2005 :: Home to NY!
- January 6, 2006 :: Unscrewup the front spar
- January 8, 2006 :: Start riveting the left skin
- January 9, 2006 :: Continue riveting the left skin
- January 12, 2006 :: Continue riveting the left skin
- January 13, 2006 :: Declared the \"left\" skin to now be the \"right\" skin
- January 14, 2006 :: Started on the left...er...right....um...the OTHER skin
- January 15, 2006 :: No fiberglass work yet, but the HS is DONE.
- March 25, 2006 :: Test fit the elevators. Started countersinking the wing spar
Vertical Stabilizer
-
- November 11, 2005 :: Start on the VS. Got the spar doubler all nice and ready
- November 12, 2005 :: Assemble and match drill the VS
- November 13, 2005 :: Prime and start rivetting the VS. Decided to wait at this point for a tech counselor check, so I moved on to the rudder.
- November 19, 2005 :: First tech counselor inspection. Started rivetting the VS. Broke stuff. Very productive day :)
- November 20, 2005 :: Took a picture of my broken part for your amusement. Remember....hammers don't break parts. People break parts.
- November 25, 2005 :: Fit the new VS-707 rib.
- November 26, 2005 :: Finsihed riveting the VS. All that's left is the fiberglass tip. Don't know when I'll get to that.
Rudder
-
- November 15, 2005 :: Start on the Rudder. Cut out tht stiffeners.
- November 16, 2005 :: Preparred the rudder skins.
- November 17, 2005 :: Drilled and dimpled the right rudder skin.
- December 12, 2005 :: Dimpled the left skin and opened Ellen's birthday gifts
- December 13, 2005 :: Primed the stiffeners
- December 14, 2005 :: Back rivetted the stiffeners and built the frame
- December 15, 2005 :: Fit counterbalance weight and dimpled the frame
- December 16, 2005 :: Primed, riveted the frame, and put up the Christmas tree
- December 17, 2005 :: Rivetted the skin except for the trailing edge
- December 18, 2005 :: Prosealed the trailing edge
- December 21, 2005 :: Rivetted the trailing edge. Rudder is DONE, except for one pesky leading edge rivet
- January 9, 2006 :: Bought low profile rivet puller from Harbor Freight so I could pull the last leading edge rivet
Right Elevator
-
Left Elevator
-
- January 29, 2006 :: Finished right elevator. Started left elevator
- February 4, 2006 :: Rivetted trim reinforcement plate nutplates. Primed stiffeners
- February 5, 2006 :: Primed skin, rivetted stiffeners, bent trailing edge
- February 11, 2006 :: Built the left elevator structure
- February 12, 2006 :: Deburring, edge finishing etc... Picked up and restored Rosie's wing jig!
- February 14, 2006 :: Where did all these animals come from???
- February 18, 2006 :: Prepared the left elevator rear spar.
- February 19, 2006 :: Primed and started rivetting left elevator. Also decided to mangle skin while I was at it.
- February 25, 2006 :: Trim tab hell.
- February 26, 2006 :: Finished the trim tab. Visit from Dave Cleveland (EAA49 president). Cracked open Wing kit
- March 24, 2006 :: Bent the leading edge
- March 25, 2006 :: Test fit the elevators. Started countersinking the wing spar
Wings
-
- February 26, 2006 :: Finished the trim tab. Visit from Dave Cleveland (EAA49 president). Cracked open Wing kit
- February 27, 2006 :: Started wing inventory. What a mess!!!
- March 2, 2006 :: Finished wing inventory
- March 10, 2006 :: Jommi's first snow :)
- March 18, 2006 :: Chopped up the wing crates and modified Paul's wing jig
- March 22, 2006 :: Officially declared the shop "tidy"
- March 25, 2006 :: Test fit the elevators. Started countersinking the wing spar
- March 26, 2006 :: Continue countersinking
- March 27, 2006 :: Rivet the nutplates
- March 28, 2006 :: More countersinking (other spar this time)
- March 30, 2006 :: Uh...let's see....oh yeah. Countersinking
- March 31, 2006 :: Tiedown bar
- April 1, 2006 :: First flight!!! (just kidding...more tiedown work)
- April 2, 2006 :: The other tie down. Got it right this time
- April 9, 2006 :: Started the rear spar
- April 16, 2006 :: More rear spar work
- April 17, 2006 :: Happy birthday Ellen! Baked a cake.....
- April 22, 2006 :: More rear spar work. Joe G. came to visit.
- April 28, 2006 :: Got some new toys from Vans
- April 29, 2006 :: Rib deburring starts....ugh
- April 30, 2006 :: Flying with Dave. My house is down there somewhere...
- May 5, 2006 :: Gretz pitot came
So long
-
- May 5, 2006 :: The RV-7 project is officially brought to a close.